Share

The HADR feature allows SAP ASE applications to operate with zero downtime while you are updating the SAP ASE software.

     Generally, the steps for performing a rolling upgrade are:

  • Upgrade the standby components
  • Perform a failover
  • Upgrade the components that are on standby after the failover

Complete the upgrade steps in a single sequence: partial upgrade is not supported (for example, you cannot upgrade some components now and then upgrade the other components at another time). Replication is suspended during some steps of a rolling upgrade, and if you perform a partial upgrade, logs continue to grow, which can result in logs or the SPQ running out of space. In the course of a rolling upgrade, it is not required for the SAP ASE and Replication Server versions to be identical.

 

  Read More Technology Blog Posts by Members articles 

#abap

By ali

Leave a Reply